Airport – Poznań Ławica

Timeline

2019

Microtik router replacement

  • Purchase and delivery of the MikroTik device
  • Device configuration

2018

BHS system modification

  • Assembly and delivery of the control cabinets
  • Connection of 4 new check-in stations
  • PLC software modification
  • Implementation of the new version of BHS software
  • Implementation and update of electrical documentation

2013

Transport luggage system development

  • Control cabinet for the new system
  • Change of the working mode for the conveyors
  • Equipment and connection of the panels for the check-in stations
  • Implement changes in the documentation
  • PLC software modifications

2010

Modernization of line no.1 PLC

  • PLC replacement
  • Connection of a existing elements to existing system
  • PLC software modification