2019
Microtik router replacement
- Purchase and delivery of the MikroTik device
- Device configuration
2018
BHS system modification
- Assembly and delivery of the control cabinets
- Connection of 4 new check-in stations
- PLC software modification
- Implementation of the new version of BHS software
- Implementation and update of electrical documentation
2013
Transport luggage system development
- Control cabinet for the new system
- Change of the working mode for the conveyors
- Equipment and connection of the panels for the check-in stations
- Implement changes in the documentation
- PLC software modifications
2010
Modernization of line no.1 PLC
- PLC replacement
- Connection of a existing elements to existing system
- PLC software modification