Chopin airport – Warsaw

Timeline

2020

Control system modification

  • replacing of Moto-starters
  • PLC software modification

2019/2020

BHS and HMI/SCADA control system modernization

  • Assembly and delivery of control cabinets
  • Participation in disassembly
  • PLC software modification
  • Modernization of SCADA/WinCC systems and HMI panels

2019/2020

Modernization of security system in Passenger Terminal

  • Assembly, delivery and implementation of security cabinet

Modernization of security system in Passenger Terminal

2019/2020

TTS modernization in passenger terminal

  • Tray sorters modernization
  • Technical documentation update
  • PLC software verification
  • Preparation of SCADA system
  • Functional tests

2019

Modification of baggage transport line

  • PLC software modification
  • montage, testing and commissioning
  • replacing of Moto-starters

Modification of baggage transport line

2016

Photoelectric sensors installation

  • Installation of photoelectric sensors and implementation of their support in PLC software

photoelectric sensors installation

2013

BHS control system

  • PLC configuration and Software development
  • Preparation of design and as-built documentation
  • Testing, Assembly and commissioning
  • Staff training
  • SCADA system configuration, and visualization installation